Shenzhen Topband Industrial Park BESS Project

Shenzhen Topband Industrial Park BESS Project

Start Time:

2017

Configuration:

1 × 40 ft container with a 500 kW inverter and a 1 MWh LFP battery system

Values:

Topband’s first C&I energy storage demonstration project: a 40 ft container with a 500 kW inverter and 1 MWh LFP battery system.

Application type:

Peak shaving and valley filling

China
Commercial & Industrial Solutions