2017
1 × 40 ft container with a 500 kW inverter and a 1 MWh LFP battery system
Topband’s first C&I energy storage demonstration project: a 40 ft container with a 500 kW inverter and 1 MWh LFP battery system.
Peak shaving and valley filling
Search across Ecosolex
Search products, solutions, case studies, news and downloadable resources.
Press Enter to search or Esc to close